wax removal treatment floor

 (letto 67 volte)
Benvenuto, ospite,
puoi consultare il forum ma non puoi scrivere.
Per intervenire nel forum effettua il login oppure registrati.
Rispondi   Aggiungi sondaggio
Vai ai messaggi non letti
Inviato il 12 Marzo 2018, 04:14:46


Messaggi: 51

slope angle is small, thin plate Zepo big mouth. 12, the plastic board should be placed on the line along the axis from the center to the periphery. The adhesive coating must be uniform, and beyond the dividing line is about 10mm and the film thickness is controlled within 1mm,

the back of the plastic plate should be evenly spreading adhesive to glue drying to sticky hands (10 to 20min) can Putie should be an accurate positioning, dense paste. 13, the plastic plate before laying,

should be preheated and wax removal treatment, otherwise it will affect the paste effect, causing the surface layer of the drum. Preheat treatment soft PVC board, should be put into the soaking temperature is 75 degrees Celsius hot water in 10 ~ 20min,
composite beam timber
composite clad exterior plywood
are vinyl railing worth the cost
polypropylene coster per square feet

Rispondi   Aggiungi sondaggio
Vai a:

© 2006-2018 Trilud S.p.A. - P.I: 13059540156 - Tecnozoom, supplemento alla testata giornalistica NanoPress registrata al Tribunale di Milano n. 314/08